Background:
The passenger elevator in the Jack Baskin Engineering Building (JBEB) will be replaced this summer.  Work is scheduled to begin the week after Spring Quarter finals (June 16th) and will likely take all summer to complete (completing something early September 2014). UCSC seeks to assess the needs of those who have mobility or stamina impairments which inhibit their use of the stairs to access the basement and 3rd floor levels of JBEB.  Those persons would ordinarly use the passenger elevator to access these locations. 

While there is a freight elevator in JBEB, it must be operated by people who have been trained to do so.  UCSC may hire and train student operators and schedule them to work business hours M-F, 8am-5pm.   However hiring of freight elevator operators is fully dependent on the disability-related needs of JBEB occupants or those needing to access the basement and/or 3rd floor.   If you do not complete the survey, do not count on an elevator operator being provided.   Note that freight elevator doors are very heavy and difficult to operate.

JBEB Floor Access Notes:

Basement - either via stairs or by loading dock stair.   Passenger elevator will be out of service.  If you need to access the basement and cannot use stairs, please self identify

Floor 1 - ground floor, access via ramps.

Floor 2 - access via E2 elevators to 2nd floor of E2 and then bridge to JBEB 2nd Floor.

Floor 3 - access via stairs only
For 3rd Floor of JBEB, there are two conference rooms, Dean's office, research accountants, OSP, grant writers, ITS and facilities staff on the 3rd floor.  If you have needs to visit those offices and cannot use the stairs be sure you complete the survey so your needs can be identified.

 

Name of person providing info.
list your email so followup can be done
List rooms or locations on basement or 3rd floor levels of JBEB that need to be reached via elevator.
Enter days, dates and times where assistance to basement or 3rd floor will be needed.